Customization: | Available |
---|---|
After-sales Service: | Online Guidance |
Warranty: | 12 Months |
Still deciding? Get samples of US$ 100/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
OILWELL A-1400PT Mud Pump Bi-metal Liner
Brand | Model |
BOMCO | F-500,F-800,F-1000,F1300,F1600,FB-1300,FB-1600,D-375,D-700 |
LANSHI | 3NB-1300C,3NB-1000,3NB-1000C,3NB-800 |
QINGZHOU | SL3NB-1300A,QZ-1000,QZ-500,QZ-350,QZ-800,SL3NB-1600 |
HONGHUA | 3NB-1600F,HHF800/1000,HHF1300/1600,HHF1600HL,HHF2200HL |
DRILLMEC | 7TS450,7TS600,9T800,9T1000,10T1300,12T1600 |
EMSCO | F-500,F-800,F-1000,F1300,F1600,FB-1300,FB-1600,FC-1600,FC-2200 |
IDECO | T-500,T-800,T-1000,T-1300,T-1600 |
GARDNER DENVER | PZ-7,PZ-8,PZ-9,PZ-10,PZ-11 |
NATIONAL | 7-P-50,8-P-80,9-P-100,10-P-130,12-P-160,14-P-200,14-P-220,K-700,K-700A,K-500,K-500A |
OILWELL | A-350PT,A-560PT,A-600PT,A-850PT,A-1100P,A-1400PT,A-1700PT |
ELLIS WILLIAMS | W-440-LP,E-447,E-2200,W446,W440 |
RUSSIAN | 8T-650,UNBT-600,UNBT-950,UNBT-1180L,UNBT-950A,UBT-400,BT-600,UB-590,UNB-600,8T-310 |
1. Preparation
Clean the installation area: remove dirt, carbon deposits and impurities inside the liner body, and ensure that the installation surface is clean and flat.
Inspect the liner body: Check whether the liner body has cracks, wear or other damage. If there is a problem, repair it first.
Prepare tools: Prepare appropriate installation tools as needed, such as press-fitting tools, wrenches, etc.
2. Apply lubricant
Apply an appropriate amount of lubricating oil or grease to the outer surface of the cylinder liner to reduce friction and resistance during installation.
3. Install the cylinder liner
Carefully place the ceramic cylinder liner into the installation position of the cylinder body, ensuring that the direction of the cylinder liner is correct.
Use the press-fitting tool, apply pressure evenly, and slowly press the cylinder liner into the liner body until the cylinder liner is installed in place. Pay attention to keeping the cylinder liner vertical and horizontal during the press-fitting process to avoid tilting or jamming.
4. Check the installation position
After installation, check whether the cylinder liner is in full contact with the bottom of the cylinder liner and whether the top of the cylinder liner is flush with the plane of the cylinder body.
5. Subsequent processing
After installation, clean the excess lubricant around the cylinder liner and cylinder body.
It should be noted that different types and specifications of ceramic cylinder liners may have different installation methods and requirements. Before installation, be sure to refer to the relevant installation instructions and technical specifications, and seek help from technicians when necessary.